• Stavros Niarchos Foundation Cultural Center, Athens, Greece
  • Extension of DEIR ALI Combined Cycle Power Plant C.C.P.P.

Geosynthetic Applications (20 projects)

2010

  • Bandar Abas Desalination project - Geotechnical conceptual design by Geo-Tubes (Tender participation), IRAN
  • Geotechnical design during construction stage of the subpart Radymno - Korzowa of A4 motorway, POLAND
  • Presidential Palace - Geotechnical conceptual design of marinas on alternative proposals by Geo-Tubes (Tender participation), UNITED ARAB EMIRATES

2008

  • Geotechnical investigation, geological & geotechnical evaluation and design for the new Concession Project "Central Greece Highway E65"
  • Geotechnical investigations and design for the construction of the motorway part: I/C Ag. Marina - I/C Raches from PATHE axis, hydrogeological study of Ch. 25+500 to Ch. 27+500 of section Int. Ag. Marina of Stilida - Int. of Raches, of Skarfia - Raches section of PATHE highway
  • New Port of Igoumenitsa (2nd stage): Geotechnical consulting services during construction
  • Geotechnical design for the rehabilitation of failures observed at various cuts along the access road for Aposelemis dam

2006

  • Geotechnical special consultancy services for the design of the project "Nestos Bridge and approaches - Part 14.1.2 - EGNATIA highway"

2005

  • Geological - Geotechnical investigations and final design for construction of earthworks for the project "Deviation Highway of Agrinion" as part of the Ionian Motorway

2004

  • Geological - Geotechnical consulting and technical support during construction of the part "Ioannina Inrechange - river Arachthos" of Egnatia Highway (2.1-4)
  • Geotechnical design of the entrance portal of Ag. Nikolaos tunnel at subpart 3.2 (Anthohori tunnel - Anilion tunnel) of Egnatia Highway
  • Geological - Geotechnical investigations and design of earthworks and structures for the road axis Heraklion - Viannos, part Alagni - Arkalohori (ch. 12+270 - ch. 7+641) at Crete
  • Geological - Geotechnical consulting services and technical support for the project "Egnatia Highway - Remaining works at the subpart Igoumenitsa - Eleftherohori, 1.1.2-6"

2003

  • Consulting services for the issue of geological - geotechnical studies on the main axis of Egnatia highway and its vertical axes, Final design of reinforced embankment for the replacement of the T7 bridge at subpart 2.4
  • Geological - Geotechnical investigations and studies for the rehabilitation of failures along the provincial road network of Heraklion prefecture (areas 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 OANAK)
  • Geotechnical investigations and studies for the rehabilitation of failures along the provincial road network of Iraklion prefecture (areas 27, 28, 29, 30, 31, 32, 33, 34 OANAK)

2002

  • Geotechnical investigation and design during construction for the project "Olympic center of rowing and Canoe - Kayak at Schinias in Marathon area"
  • Geological - geotechnical investigations and design for the project: " National road N. Chalkidona - Edessa - Florina - Jugoslavian borders"
  • Geotechnical investigations and design during construction for the project "Construction of road Agios Sozon - Alagni (ch. 0+000 - 12+270) and additional works in the section Kallithea - Agios Sozon at Heraclion Prefecture - Crete
  • Urgent geological - geotechnical investigations and studies at locations of landslides - rockfalls along the valley of Tempi in No 1 highway Athens - Thessaloniki (P.A.TH.E.)