• Stavros Niarchos Foundation Cultural Center, Athens, Greece
  • Extension of DEIR ALI Combined Cycle Power Plant C.C.P.P.

Energy and Local Resources - Renewable Energy projects (12 projects)

2010

  • Additional geotechnical investigations and design for the extension project of HEL.PE. at Elefsina
  • Geotechnical and geophysical investigations at the area of high pressure gas pipeline across Korinth channel

2009

  • Environmental Site Assessment Phase II in the context of project "Combined Cycle Power Plant of Installed Capacity 436.6 MW at Ag. Theodori, Corinth, GREECE"

2007

  • Geotechnical investigations evaluation and design of the new Unit 5 at Aliveri Power Plant - Evia

2006

  • Undersea gevotechnical investigations and evaluation at the shore Sessi - Grammatiko in the island Evoia for the construction of the new Gas Pipeline

2005

  • Geotechnical investigations and design for the construction of a new Power Plant at Ag. Nikolaos - Viotia on behalf of Aluminium of Greece B.E.A.E.

2004

  • Geotechnical final design for the protection of the high pressure main pipeline of natural gas. Landslide at ch. 362+100 at Kitro Pieria
  • Operation and maintenance of transportation systems for the natural gas pipeline - Ampelia Farsala. Final geotechnical - hydraulic study
  • High pressure natural gas pipeline, at Bralos area C5/C6/C7. Placement and monitoring of adequate geotechnical equipment

2003

  • Geotechnical investigations for the detailed design of the natural gas pipeline in the part Komotini- Alexandroupoli- Kipi

2002

  • Geotechnical investigation of combined cycle unit CCPP 390MW in Thessaloniki
  • Geotechnical investigation and design for the project "Kavala CCGT Power Station"