• Stavros Niarchos Foundation Cultural Center, Athens, Greece
  • Extension of DEIR ALI Combined Cycle Power Plant C.C.P.P.

GeoEnvironmental Studies (44 projects)

Environmental Impact Assessment (projects 11)

2009

  • Environmental Permit for the groundwater well along the transport belt of minerals upstream of Xigi bridge at Stavros Euvoia (LΑRCΟ GMMSA)

2006

  • Environmental report for the foundation of institutional complex at the community of Rodopoli (Community of Rodopoli)
  • Environmental Impact Assessment in the context of project "Design a passengers terminal and other rehabilitation works to improve function of Acadias, Rodos port" (MINISTRY OF PUBLIC WORKS)

2005

  • Environmental Impact Assessment for the country road: Lafiona – Mavrokampos (7) and Mavrokampos – Ag. Triada (8) (Municipality of Petra, Lesvos island)

2004

  • Environmental Impact Assessment for the project "Fishing shelter and touristic boats facilities in Petra Municipality of Lesvos island" (Petra Municipality, Lesvos)

2003

  • Environmental Impact Assessment of low dam at Rorou – Tzertzelia drainage basin, Prefecture of Argolida (Peloponnesus Region)
  • Environmental Impact Assessment for the project "Study of small water-barriers at the Sarapio area in Northeast Chios island" (Chios Prefecture)
  • Environmental Impact Assessment for the project "Study for the connection of ΑΤΕΙ Thessaloniki and ΕΧΡΟ 2008 with the railway network» (ΟΣΕ SA)
  • Environmental Impact Assessment for an alternative alignment of the railway line at the section Iasmos – Polyanthos and Kompsatos river bridge (ΟΣΕ SA)
  • Environmental Impact Assessment for the project "Off-stream water pond at Xylokastro, Corinth" (Municipality of Corinth)
  • Environmental Impact Assessment for the project "Sewage network, sewage treatment facilities and disposal of Municipality Dikaiou" (Municipality Dikaiou, Kos island)
 

Environmental Site Assessment Phase I & II (28 projects)

2013

  • Geochemical survey along pipe line route in the context of project «TRANS ANDRIATIC PIPELINE_TAP_ SECTION A: GREECE WEST FROM NEA MESSIMVRIA TO BORDER LINE GR/AL» (C&M ENGINEERING).

2012

  • ESA in the context of project «ΑΤΤΙΚΟ ΜΕΤRΟ – EXTENSION OF LINE 3, SECTION : CHAIDARI - PIREAUS» (J/V J&P ABΑΞ S.A. - GHELLA SPA - ALSTOM TRANSPORT S.A).
  • Evaluation of soil pollution from the presence of heavy (asphaltic) fractions in the plant property – Remediation Strategy (THEBES PIPEWORKS S.A.)
  • Geochemical survey along pipe line route in the context of project « FEED & EIA for Natural Gas Interconnector Greece – Bulgaria (IGB) Project» (C&M ENGINEERING).
  • Geochemical survey along pipe line route in the context of project "Geotechnical Investigation along the High Pressure Natural Gas Pipeline from Ag.Theodori to PPC Megalopolis" (J&P ΑΒΑΞ S.A.).

2011

  • Sea Water Quality Monitoring in the context of project "Stavros Niarchos Foundation – Cultural Center, Hydrogeological abstraction tests, Sea Water Sampling and tests, Groundwater Monitoring" (Stavros Niarchos Foundation)
  • Environmental Site Assessment Phase II for Agriphar (former Geopharm) at Aspropyrgos, Attica Prefecture, Greece (AGRIPHAR SA)

2009

  • Environmental Site Assessment Phase II in the context of project "Combined Cycle Power Plant of Installed Capacity 436.6 MW at Ag. Theodori, Corinth, GREECE"

2008

  • Environmental geochemical study of bottom sediments of Larymna Gulf (LΑRCΟ GMMSA)
  • Soil Geochemical survey at the area of metallurgic plant of LARCO GMMSA in Larymna and boundary settlement» (LΑRCΟ GMMSA)
  • Environmental Site Assessment investigations at ITT Water & Wastewater project, Acharnes (ERM GmbH Germany)
  • Eleusis Refinery Upgrade Project, Geotechnical and Geochemical Investigations for the Foundation of the New Substation S/S6004 (HELLENIC PETROLEUM SA)

2007

  • Soil and groundwater investigations (ESA Phase II) for environmental consultancy in Stavros Niarchos Foundation – Culture Center (Stavros Niarchos Foundation)
  • Soil and groundwater investigations for environmental consultancy in Thales Electronics Systems S.A. at Koropi (USRcorp France)
  • Environmental Site Assessment Phase II at the north / north east area of Eleonas train depot in the context of project «Geological and Geotechnical Investigations and Studies of Athens Metro New Extensions» (ΑTTIKO METRO SA)

2006

  • Environmental Hydrogeochemical Monitoring in the context of project "Attiko Metro, Extension of Line 3 from Egaleo to Chaidari" (Αlpine Mayreder)

2005

  • Soil Geochemical survey in Kokkini area of Larymna for slag wastes deposition (LΑRCΟ GMMSA)
  • Groundwater monitoring in Kokkini area of Larymna for slag wastes deposition (LΑRCΟ GMMSA)

2004

  • Environmental Site Assessment Phase II at the Commercial Complex "ΕΜΠΕΔΩΣ", Pireos str. 39-43, former ΕΛΒΥΝ refinery» (ΕΜPEDOS SA)

2003

  • Geochemical survey along pipe line direction in the context of project "Detailed design of natural gas high pressure pipeline at support Kipoi (G/T borders) – Alexandroupoli - Komotini" (ASPROFOS SA)
  • Environmental Site Assessment Phase II and Environmental Risk Analysis and Assessment in Eleonas train depot of Athens Metro in the context of project «New Extensions of Athens Metro» (ΑTTIKO METRO SA)
  • Environmental Geochemical study of a private land property, in Legrena, Attica Prefecture (Private Client)
  • Environmental Geochemical study in a land property for the foundation of a new institutional building (TEE) in Lavrion, Attica Prefecture (ΟΣΚ)
  • ESA Phase I in the context of "Undersea Tunnel In Thessaloniki" project (J/V PANTECHNIKI SA – ΑTTIKAT SA)

2002

  • Environmental Investigations (ESA Phase II) in the context of New extensions of Athens metro "Geotechnical Investigations for the west extension of line 3 from Asomaton to Thivon" (J/V ΑKTOR SA, IMPREGILO SPA)
  • Environmental Hydrogeochemical Study in the context of project "Kavala CCGT Power Station - Preliminary geotechnical investigations" (Consortium Kavala CCGT Power Plant)
  • Preliminary Environmental Site Assessment Phase II at the Commercial Complex "ΕΜΠΕΔOΣ", Pireos str. 39-43, former ΕΛΒΥΝ refinery» (ΕΜPEDOS S.A.)
  • Soil and groundwater investigations for environmental consultancy in Acharnes (ERM LΑΗΜΕΥΕR International Gmbh)
     

    Wastes Projects (10 projects)

    2011

    • Advanced environmental investigations at the proposed landfill area, Obriokastro, Keratea, Attica Prefecture (National University of Athens)

    2008

    • Environmental characterization of recycling dusts from rotary kilns as solid wastes according to ΕC/33/2003 (LΑRCΟ GMMSA)
    • Environmental characterization of converter slags as solid wastes according to ΕC/33/2003 (LΑRCΟ GMMSA)

    2006

    • Technical study for the rehabilitation of the uncontrolled landfill at the area "Αg. Ioannis Lovos" of Thira Municipality (Thira Municipality)
    • Technical study for the rehabilitation of the uncontrolled landfill at the area "ΑSTRAS" of Kea Municipality, Cyclades (Kea Municipality)
    • Preliminary Environmental Impact Assessment of landfill at island Thira – Thirasia and the rehabilitation of the active uncontrolled landfill at the area "Alonaki" (Thira Municipality)
    • Final study for the rehabilitation of the uncontrolled landfill at the area "Marmaries – Kokkina" of Tinos Municipality (Tinos Municipality)
    • Final study for the rehabilitation of the uncontrolled landfill at the area "Braxies" of Τhirasia island, Oia Community (Community of Oia)

    2004

    • Foundation of urban wastes transfer terminal for Athens Municipality and neighboring municipalities (Athens Municipality)
    • Land deposition of electric furnace slags at Kokkini area, Larymna (LΑRCΟ GMMSA)