• Stavros Niarchos Foundation Cultural Center, Athens, Greece
  • Extension of DEIR ALI Combined Cycle Power Plant C.C.P.P.

Environmental Site Assessment Phase I & II (28 projects)

2013

  • Geochemical survey along pipe line route in the context of project «TRANS ANDRIATIC PIPELINE_TAP_ SECTION A: GREECE WEST FROM NEA MESSIMVRIA TO BORDER LINE GR/AL» (C&M ENGINEERING).

2012

  • ESA in the context of project «ΑΤΤΙΚΟ ΜΕΤRΟ – EXTENSION OF LINE 3, SECTION : CHAIDARI - PIREAUS» (J/V J&P ABΑΞ S.A. - GHELLA SPA - ALSTOM TRANSPORT S.A).
  • Evaluation of soil pollution from the presence of heavy (asphaltic) fractions in the plant property – Remediation Strategy (THEBES PIPEWORKS S.A.)
  • Geochemical survey along pipe line route in the context of project « FEED & EIA for Natural Gas Interconnector Greece – Bulgaria (IGB) Project» (C&M ENGINEERING).
  • Geochemical survey along pipe line route in the context of project "Geotechnical Investigation along the High Pressure Natural Gas Pipeline from Ag.Theodori to PPC Megalopolis" (J&P ΑΒΑΞ S.A.).

2011

  • Sea Water Quality Monitoring in the context of project "Stavros Niarchos Foundation – Cultural Center, Hydrogeological abstraction tests, Sea Water Sampling and tests, Groundwater Monitoring" (Stavros Niarchos Foundation)
  • Environmental Site Assessment Phase II for Agriphar (former Geopharm) at Aspropyrgos, Attica Prefecture, Greece (AGRIPHAR SA)

2009

  • Environmental Site Assessment Phase II in the context of project "Combined Cycle Power Plant of Installed Capacity 436.6 MW at Ag. Theodori, Corinth, GREECE"

2008

  • Environmental geochemical study of bottom sediments of Larymna Gulf (LΑRCΟ GMMSA)
  • Soil Geochemical survey at the area of metallurgic plant of LARCO GMMSA in Larymna and boundary settlement» (LΑRCΟ GMMSA)
  • Environmental Site Assessment investigations at ITT Water & Wastewater project, Acharnes (ERM GmbH Germany)
  • Eleusis Refinery Upgrade Project, Geotechnical and Geochemical Investigations for the Foundation of the New Substation S/S6004 (HELLENIC PETROLEUM SA)

2007

  • Soil and groundwater investigations (ESA Phase II) for environmental consultancy in Stavros Niarchos Foundation – Culture Center (Stavros Niarchos Foundation)
  • Soil and groundwater investigations for environmental consultancy in Thales Electronics Systems S.A. at Koropi (USRcorp France)
  • Environmental Site Assessment Phase II at the north / north east area of Eleonas train depot in the context of project «Geological and Geotechnical Investigations and Studies of Athens Metro New Extensions» (ΑTTIKO METRO SA)

2006

  • Environmental Hydrogeochemical Monitoring in the context of project "Attiko Metro, Extension of Line 3 from Egaleo to Chaidari" (Αlpine Mayreder)

2005

  • Soil Geochemical survey in Kokkini area of Larymna for slag wastes deposition (LΑRCΟ GMMSA)
  • Groundwater monitoring in Kokkini area of Larymna for slag wastes deposition (LΑRCΟ GMMSA)

2004

  • Environmental Site Assessment Phase II at the Commercial Complex "ΕΜΠΕΔΩΣ", Pireos str. 39-43, former ΕΛΒΥΝ refinery» (ΕΜPEDOS SA)

2003

  • Geochemical survey along pipe line direction in the context of project "Detailed design of natural gas high pressure pipeline at support Kipoi (G/T borders) – Alexandroupoli - Komotini" (ASPROFOS SA)
  • Environmental Site Assessment Phase II and Environmental Risk Analysis and Assessment in Eleonas train depot of Athens Metro in the context of project «New Extensions of Athens Metro» (ΑTTIKO METRO SA)
  • Environmental Geochemical study of a private land property, in Legrena, Attica Prefecture (Private Client)
  • Environmental Geochemical study in a land property for the foundation of a new institutional building (TEE) in Lavrion, Attica Prefecture (ΟΣΚ)
  • ESA Phase I in the context of "Undersea Tunnel In Thessaloniki" project (J/V PANTECHNIKI SA – ΑTTIKAT SA)

2002

  • Environmental Investigations (ESA Phase II) in the context of New extensions of Athens metro "Geotechnical Investigations for the west extension of line 3 from Asomaton to Thivon" (J/V ΑKTOR SA, IMPREGILO SPA)
  • Environmental Hydrogeochemical Study in the context of project "Kavala CCGT Power Station - Preliminary geotechnical investigations" (Consortium Kavala CCGT Power Plant)
  • Preliminary Environmental Site Assessment Phase II at the Commercial Complex "ΕΜΠΕΔOΣ", Pireos str. 39-43, former ΕΛΒΥΝ refinery» (ΕΜPEDOS S.A.)
  • Soil and groundwater investigations for environmental consultancy in Acharnes (ERM LΑΗΜΕΥΕR International Gmbh)